![]() |
![]() |
|
Tier 1 and Tier 2 Revitalization Strategies
These projects were funded by the Chester County Commissioner's Landscapes 21st Century Fund under a Tier 1 and Tier 2 program of work. Tier 1 Tier 1 is an update to the 1999 Downtown Parking Study and Revitalization Plan with an emphasis
on the Central Business District (CBD). The CBD includes four blocks of Lincoln Highway from First to Fourth, and the adjacent blocks of Harmony, Diamond, Chestnut
and Fleetwood ending at the Amtrak rail station. It also includes the Coatesville Historic Steel District, some Bethlehem/Lukens properties, the "Flats", and
the properties adjacent to Brandywine Creek as the creek traverses the CBD. Tier 2 Tier 2 is a detailed Revitalization Plan for two parts of the "Urban Center" of the City. Detailed urban design plans are prepared for two (2) key parts of the City, the existing
downtown, and the new areas adjoining the historical CBD. You will need Adobe Acrobat Reader to view many of these documents. You can download the reader by clicking here or on the link below Most of the figures and maps are not included due to the size of the graphic files. Hard copies of the report are available at City Hall. Tier 1 Report
Tier 2 Report
|
|
|